Boden - Tucher Ingenieure GmbH https://tup.siera.com/en Engineering for a better tomorrow Tue, 20 Jun 2023 00:00:00 +0000 en-GB hourly 1 https://tup.siera.com/wp-content/uploads/2022/06/Logo-MP_TP-Tucher-Ingenieure-GmbH-new-for-email-signature_TP-ARCHITEKTEN-UND-INGENIEURE-1.png Boden - Tucher Ingenieure GmbH https://tup.siera.com/en 32 32 Erweiterungs-, Neu- und Umbaumaßnahmen, Flugplatz Wunstorf https://tup.siera.com/en/projects/erweiterungs-neu-und-umbaumasnahmen-flugplatz-wunstorf/?utm_source=rss&utm_medium=rss&utm_campaign=erweiterungs-neu-und-umbaumasnahmen-flugplatz-wunstorf Thu, 08 Jun 2023 00:00:00 +0000 https://ibgw-leipzig.de/?post_type=projects&p=21026 Period: Since 2012 Field of activity: Historical investigation of explosive ordnance contamination, specialist construction management and local construction supervision for explosive ordnance clearance in accordance with construction guidelines for explosive ordnance clearance Scope of services:

The post Extension, new construction and conversion measures, Wunstorf airfield first appeared on Tucher Engineers GmbH.

]]>
Period: Since 2012

Field of activity: Historical investigation of explosive ordnance,

Technical construction management and local construction supervision for explosive ordnance disposal in accordance with the German Ordinance on Explosive Ordnance Disposal (Ordinance on Explosive Ordnance Disposal).

Construction guidelines for explosive ordnance disposal

Scope of services:

  • Creation of a historical-genetic reconstruction
  • Planning services
  • Preparation of clearance concepts, consulting services
  • Participation in construction meetings
  • Coordination/control of explosive ordnance clearance
  • Preparation of work/safety plans
  • Preparation of tender documents, assistance in awarding contracts
  • Cost/invoice control
  • Local construction supervision

Short description: With the planned stationing of the Airbus A 400 M transport aircraft at the Wunstorf military airfield in the area of responsibility of the State Construction Management of Lower Saxony, an adaptation of the infrastructure is necessary. For this purpose, extensive expansion, new construction and conversion measures have been carried out on the existing building and technical stock or are still being implemented. Due to its previous use in World War II as a Wehrmacht airbase, the site is classified as contaminated with explosive ordnance. History has shown that the area was hit in the course of bombing raids. The main cause is the burial of explosive ordnance. Therefore, explosive ordnance clearance is required for construction work involving ground intervention. Computer-aided area soundings, borehole soundings, explosive ordnance clearance during construction or at specific points and the use of a separation system are used. Since 2012, M&P has been responsible for the necessary technical construction management and local construction supervision of the explosive ordnance clearance.

The post Extension, new construction and conversion measures, Wunstorf airfield first appeared on Tucher Engineers GmbH.

]]>
Ausbau des Nord-Ostsee-Kanals, Testfelderkundung Kampfmittel https://tup.siera.com/en/projects/ausbau-des-nord-ostsee-kanals-testfelderkundung-kampfmittel/?utm_source=rss&utm_medium=rss&utm_campaign=ausbau-des-nord-ostsee-kanals-testfelderkundung-kampfmittel Tue, 20 Jun 2023 00:00:00 +0000 https://ibgw-leipzig.de/?post_type=projects&p=21193 Period: since 2017 Field of activity: Explosive ordnance clearance Scope of services: Results incl. updating of cost estimate and handover in GAEB format In the course of the replacement construction of the old

The post Expansion of the Kiel Canal, test field exploration for explosive ordnance first appeared on Tucher Engineers GmbH.

]]>
Period: since 2017

Field of activity: Explosive ordnance disposal

Scope of services:

  • Evaluation of available basic data, HgR, aerial photo evaluations and construction documents incl. deficit analysis
  • Planning of test field investigations for subsequent KMR measures of phases B and C according to BFR KMR
  • Creation of a project GIS for the documentation of all CMM measures and their

Results incl. update

  • Development of a KM exploration concept for preliminary test field investigations on water and land surfaces (including Cs vapour sensors, TDEM methods, sonar and echo sounder)
  • Drawing up of the performance specification and the bill of quantities incl.

Cost estimation and transfer in GAEB format

  • Quality control and local construction supervision
  • Technical construction management to support the client
  • Evaluation and analysis of the sounding data
  • Development of recommendations for KM exploration in the run-up to the planned construction measures on the basis of the test field exploration results.

In the course of the replacement of the old Levensau High Bridge and the extension of the Kiel Canal (NOK) from km 93.2 to 94.2, the existing navigation channel is to be widened by receding the banks and dredging the beds. In preparation, geophysical investigations are to be carried out in the section of the canal in order to

  • Undetonated drop munitions of the Second World War as individual anomalies
  • Explosive ordnance from munitions sinkholes as individual anomalies or as possible

Load areas

  • detect and identify scrapped or other areas that cannot be evaluated.

The investigation services and subsequent salvage services are to be put out to tender by the Federal Waterways and Shipping Administration (WSV). The investigation area is mostly under water and covered with armourstone containing iron silicate. The bank area from the water change zone to the shoulder of the embankment is designed as a paved area of armourstones (granite) with a backfill of slag rock on top. The planning of the test field soundings foresees the use of different echosounder and sonar methods to explore the water bottom. Subsequently, geomagnetic surface soundings using total field magnetometers and underwater TDEM soundings will be carried out. The comparison of all available results will provide reliable information on the applicability of the individual methods and their limitations. The measurement data from the 2019/2020 soundings are currently being analysed in detail.

The post Expansion of the Kiel Canal, test field exploration for explosive ordnance first appeared on Tucher Engineers GmbH.

]]>
Stadtteilentwicklung Grasbrook https://tup.siera.com/en/projects/stadtteilentwicklung-grasbrook/?utm_source=rss&utm_medium=rss&utm_campaign=stadtteilentwicklung-grasbrook Tue, 20 Jun 2023 00:00:00 +0000 https://ibgw-leipzig.de/?post_type=projects&p=21194 Period: 2018 Field of activity: Explosive ordnance clearance Scope of services: Consultancy services, basic evaluation, planning services Brief description: The Überseezentrum is the first sub-area of the Überseezentrum, which is currently under development.

The post Grasbrook district development first appeared on Tucher Engineers GmbH.

]]>
Period:2018
Field of activity:Explosive ordnance clearance
Scope of services:Consulting services, basic evaluation, planning services
Short description:The Überseezentrum is the first section of the Grasbrook project area currently under development. A detailed report on the explosive ordnance situation was prepared by M&P's specialist staff, including a basic investigation with detailed historical research into the development of the site, as well as a risk assessment for various future construction work. Furthermore, the report includes a preliminary planning of the necessary probing and clearance measures with cost estimation. An excerpt from the report forms the technical contribution to the explosive ordnance clearance for the site report.

The post Grasbrook district development first appeared on Tucher Engineers GmbH.

]]>
Versmannkai Ost, Baufeldfreimachung BF 102-110 https://tup.siera.com/en/projects/versmannkai-ost-baufeldfreimachung-bf-102-110/?utm_source=rss&utm_medium=rss&utm_campaign=versmannkai-ost-baufeldfreimachung-bf-102-110 Tue, 20 Jun 2023 00:00:00 +0000 https://ibgw-leipzig.de/?post_type=projects&p=21195 Period: 2016 - 2018 Field of activity: Explosive ordnance clearance Scope of services: Consultancy services, planning services, tendering, participation in the awarding of contracts, specialist construction supervision Brief description: Versmannkai Ost is located

The post Versmannkai East, site clearance BF 102-110 first appeared on Tucher Engineers GmbH.

]]>
Period:2016 - 2018
Field of activity:Explosive ordnance clearance
Scope of services:Consultancy services, planning services, tendering, participation in award of contract, construction supervision
Short description:Versmannkai Ost is located in the Elbbrücken quarter of HafenCity. The construction sites 102, 105, 108 and 110 were located in a former water area that had not yet been explored. The aim of the work was to check the unexplored construction sites with suspected unexploded bombs down to a depth of -9.5 m below sea level (-15 m below ground level) by means of borehole sounding and to achieve clearance.In the run-up to the sounding work, existing quay installations (quay slab, concrete spar, sheet pile wall) had to be demolished in some areas. The sheet pile wall was only partially removed. The soundings were carried out by means of a three-axis magnetometer, supplemented by an active method (here 4R-EM) and borehole georadar in order to keep the deep construction work for the salvage as low as possible. The recovery at greater depths was carried out by means of large boreholes and diving. The terrain was adjusted by filling the excavation pits and modelling to contractually agreed transfer heights.

The post Versmannkai East, site clearance BF 102-110 first appeared on Tucher Engineers GmbH.

]]>
Konversion ehem. BW-Krankenhaus Rostrup, Bad Zwischenahn https://tup.siera.com/en/projects/konversion-ehem-bw-krankenhaus-rostrup-bad-zwischenahn/?utm_source=rss&utm_medium=rss&utm_campaign=konversion-ehem-bw-krankenhaus-rostrup-bad-zwischenahn Tue, 20 Jun 2023 00:00:00 +0000 https://ibgw-leipzig.de/?post_type=projects&p=21196 Period: Since 2009 Field of activity: Explosive ordnance clearance, construction site construction, demolition, contaminated sites, unsealing, soil and waste management (material flows), planning services in accordance with federal work aids Scope of services: Explosive ordnance and contaminated sites

The post Conversion of the former BW Hospital Rostrup, Bad Zwischenahn first appeared on Tucher Engineers GmbH.

]]>
Period: Since 2009

Field of activity: Explosive ordnance clearance, construction site construction, deconstruction, contaminated sites, unsealing,

Soil and waste management (material flows),

Planning services in accordance with federal working aids

Scope of services:

  • Creation of a historical-genetic reconstruction (HgR)

Explosive ordnance and contaminated sites

  • Preparation of a cost estimate for the implementation of phase B/C -
  • Sounding and clearing concept
  • Preparation of the sounding and clearance concept Deconstruction planning incl. pollutant register
  • Explosive ordnance detection and clearance planning
  • Investigation/hazard assessment in the sense of BBodSchG
  • Planning soil remediation
  • Soil and waste management planning
  • Preparing investigations in the LSG
  • Conducting discussions with authorities
  • Support of the AG in renegotiations with the BImA
  • Preparation of tender documents and participation in
  • Bidder talks
  • Supervision of the execution, coordination of the individual trades,
  • Cost controlling, sampling and analytics
  • Implementation of funding management (N-Bank -> EFRE)

The above services cover the AHO/HOAI planning areas in all phases.

The post Conversion of the former BW Hospital Rostrup, Bad Zwischenahn first appeared on Tucher Engineers GmbH.

]]>
Ergänzende Detailuntersuchung zum Altlastenrisiko des Grundstücks Hastedter Osterdeich in Bremen https://tup.siera.com/en/projects/erganzende-detailuntersuchung-zum-altlastenrisiko-des-grundstucks-hastedter-osterdeich-in-bremen/?utm_source=rss&utm_medium=rss&utm_campaign=erganzende-detailuntersuchung-zum-altlastenrisiko-des-grundstucks-hastedter-osterdeich-in-bremen Tue, 20 Jun 2023 00:00:00 +0000 https://ibgw-leipzig.de/?post_type=projects&p=21197 Period: 2017-2019 Field of activity: Orientational investigation of contaminated sites, detailed investigation, supplementary detailed investigation Scope of services: Soil, soil gas and groundwater investigations on the site of a former transformer station suspected of being contaminated

The post Supplementary Detailed Investigation of the Contaminated Site Risk of the Hastedter Osterdeich Property in Bremen first appeared on Tucher Engineers GmbH.

]]>
Period:2017-2019
Field of activity:Orienting investigation of contaminated sites, detailed investigation, supplementary detailed investigation
Scope of services:Soil, soil air and groundwater investigations on the suspected contaminated site of a former transformer station in connection with several contaminated sites in the immediate vicinity
Short description:Before the Second World War, a roofing felt factory was located in the area of the study site and the neighbouring property to the east, which burnt down completely in 1938.In the area of the Hastedter Osterdeich property, a total of two areas of damage were localised, which can be differentiated into a central and a southern input area.In addition to considerable PAH contamination, high concentrations of CHC and BTEX were detected in the soil and groundwater. In the course of several investigation steps, the source areas were roughly localised and delimited, including detailed investigation of the contaminant plume in the groundwater downstream.

The post Supplementary Detailed Investigation of the Contaminated Site Risk of the Hastedter Osterdeich Property in Bremen first appeared on Tucher Engineers GmbH.

]]>
Orientierende Untersuchung (Phase IIa) der Standortschießanlage Bad Arolsen, Bad Arolsen https://tup.siera.com/en/projects/orientierende-untersuchung-phase-iia-der-standortschiesanlage-bad-arolsen-bad-arolsen/?utm_source=rss&utm_medium=rss&utm_campaign=orientierende-untersuchung-phase-iia-der-standortschiesanlage-bad-arolsen-bad-arolsen Tue, 20 Jun 2023 00:00:00 +0000 https://ibgw-leipzig.de/?post_type=projects&p=21198 Period: 2020 Field of activity: Orienting investigation Scope of services: Orienting investigation in accordance with construction guidelines for soil and groundwater protection (BFR BoGWS) Brief description: The commissioned scope of services

The post Orienting investigation (Phase IIa) of the Bad Arolsen site shooting range, Bad Arolsen first appeared on Tucher Engineers GmbH.

]]>
Period:2020
Field of activity:Orienting examination
Scope of services:Orienting investigation according to the Building Guidelines for Soil and Groundwater Protection (BFR BoGWS)
Short description:The commissioned scope of services included investigations in accordance with the construction guidelines for soil and groundwater protection for phase IIa (orienting investigation).A business unit (BU) with five different suspected contamination areas, which were identified in the previous phase I, was considered. The target/bullet trap areas of the individual firing ranges represent the suspected contamination areas.The WE was used by the German Federal Armed Forces as a firing range between 1964 and 1997. Before that, the area was used for agriculture. In 2002, the site was handed over to the Bundesanstalt für Immobilienaufgaben (Federal Agency for Real Estate Tasks) and now examined for harmful soil changes in the course of a planned restitution measure.The aim of the orienting investigation was to examine possible contamination under consideration of the impact pathway soil-human. Within the framework of the project, orienting investigations of the topsoil of the shooting range areas were carried out, among other things. In order to obtain a reliable statement as to whether projectile residues may be found in the mounds, these were examined by means of trenching. The results of the investigations and the chemical analyses were documented and evaluated in an expert report. A risk assessment was carried out with regard to the soil-human impact pathway and recommendations for measures were formulated.

The post Orienting investigation (Phase IIa) of the Bad Arolsen site shooting range, Bad Arolsen first appeared on Tucher Engineers GmbH.

]]>
Historische Erkundung ehem. Kurhessenkaserne, Hann. Münden https://tup.siera.com/en/projects/historische-erkundung-ehem-kurhessenkaserne-hann-munden/?utm_source=rss&utm_medium=rss&utm_campaign=historische-erkundung-ehem-kurhessenkaserne-hann-munden Tue, 20 Jun 2023 00:00:00 +0000 https://ibgw-leipzig.de/?post_type=projects&p=21199 Field of activity: Phase I in accordance with BFR BoGwS Scope of services: Archive research & enquiries, aerial photo evaluation, site inspection, OU concept & cost estimate Brief description: The plant has been in operation since

The post Historical exploration of the former Kurhessen barracks, Hann. Münden first appeared on Tucher Engineers GmbH.

]]>
Field of activity:Phase I according to BFR BoGwS
Scope of services:Archive research & enquiries, aerial photo evaluation, site inspection, OU concept & cost estimate
Short description:Since its construction in 1901, the site has been in continuous use until 1993. During the imperial era, the site was used as a training area for pioneers, with the "Großes Pionierübungswerk" as its centrepiece. After it was partially filled in, a land training area was created and motor vehicle halls and accommodation were built. A phase of civilian use followed around the end of the First World War. From 1934 until the end of the Second World War, pioneers were again trained for frontline operations. At the end of the 1940s, small companies settled here, including a car repair shop, a seed trade and a metal recycling company, and used the former pioneer training site partly as a rubbish dump. In 1956, the Federal Armed Forces took over an almost complete old building stock. Due to the long and complex history, the focus was on the reappraisal and clarification of the partly small-scale uses. A total of 19 areas suspected of contamination were identified. Each site was described and assessed in a fact sheet. For 17 contaminated sites there was a need for further investigation within the framework of Phase IIa. Due to the extensive sealing of the area, investigations of the groundwater were initially dispensed with. For the exploration of the subsoil, small percussion drillings (KRB) were recommended in the area of each KVF until the grown soil was safely reached or until organoleptically/sensory inconspicuous soil layers were reached.

The post Historical exploration of the former Kurhessen barracks, Hann. Münden first appeared on Tucher Engineers GmbH.

]]>
Orientierende Untersuchung Altablagerungen Tündern https://tup.siera.com/en/projects/orientierende-untersuchung-altablagerungen-tundern/?utm_source=rss&utm_medium=rss&utm_campaign=orientierende-untersuchung-altablagerungen-tundern Tue, 20 Jun 2023 00:00:00 +0000 https://ibgw-leipzig.de/?post_type=projects&p=21200 Sampling, analysis and evaluation of topsoil mixture sample areas in accordance with BBodSchV; carrying out small pile drilling, sampling, preparation of mixture samples and evaluation in accordance with LAGA TR Boden; sampling,

The post Orienting investigation of old deposits in Tündern first appeared on Tucher Engineers GmbH.

]]>
  • Period: 09/2019 - 01/2020
  • Field of activity: Environment; Orienting investigation of two contaminated sites in Tündern recorded in the register of contaminated sites of the State of Lower Saxony.
  • Scope of services:
  • Sampling, investigation and evaluation of topsoil composite sample areas according to BBodSchV; execution of small pile driving boreholes, sampling, composite sample preparation and evaluation according to LAGA TR Boden; sampling, investigation and evaluation of soil air soundings according to LAWA and LABO; sampling, investigation and evaluation of groundwater according to LAWA; risk assessment for the impact paths soil - humans and soil - groundwater; evaluation according to waste legislation; documentation of results.

    • Short description:
      • Orienting investigation of two contaminated sites listed in the state's

    Lower Saxony's old deposits in Tündern. The first contaminated site consists of backfilled lowlands or former ponds that were created from a former oxbow lake of the Weser. The lowlands were filled with household and bulky waste, excavated soil, construction waste and industrial waste. The second contaminated site comprises a former sand and gravel pit that was backfilled with household and bulky waste, commercial waste, garden and park waste, agricultural and forestry waste, construction waste, excavated soil and road debris. Both contaminated sites are located in residential areas.

    The objectives of the orienting investigation are to explore the extent of the two landfills as well as the thickness and composition of the landfill material and the landfill cover. In view of the use of the two old landfills as residential areas, a risk assessment for human health is to be carried out for the landfill cover via the impact pathway soil-human. For the landfill, an assessment is to be made in terms of waste legislation. In addition, the potential impacts of the landfill and the hazards for the objects of protection soil, soil air and groundwater are to be assessed.

    The post Orienting investigation of old deposits in Tündern first appeared on Tucher Engineers GmbH.

    ]]>
    Orientierende Untersuchungen der Bohrschlammgrube „Wustrow Z3“ https://tup.siera.com/en/projects/orientierende-untersuchungen-der-bohrschlammgrube-wustrow-z3/?utm_source=rss&utm_medium=rss&utm_campaign=orientierende-untersuchungen-der-bohrschlammgrube-wustrow-z3 Tue, 20 Jun 2023 00:00:00 +0000 https://ibgw-leipzig.de/?post_type=projects&p=21201 Period: 2018 Field of activity: Historical exploration and exploratory investigationSamplingHazard assessment Scope of services: Historical explorationOrientatory investigation incl. field workHazard assessment Brief description: Carrying out an exploratory investigation of the

    The post Orienting investigations of the "Wustrow Z3" drilling mud pit first appeared on Tucher Engineers GmbH.

    ]]>
    Period:2018
    Field of activity:Historical exploration and orienting investigationSamplingHazard assessment
    Scope of services:Historical explorationOrientative investigation incl. fieldworkHazard assessment
    Short description:Conducting an orienting investigation of the Wustrow Z3 drilling mud pit near Bösel in Lüchow (Wendland). The investigation was carried out in accordance with the GEOFAKTEN 29 working aids, Phase II - Confirmation/elimination of the suspected hazard.

    The post Orienting investigations of the "Wustrow Z3" drilling mud pit first appeared on Tucher Engineers GmbH.

    ]]>