Umwelt - Tucher Ingenieure GmbH https://tup.siera.com/en Engineering for a better tomorrow Wed, 09 Aug 2023 11:41:44 +0000 en-GB hourly 1 https://tup.siera.com/wp-content/uploads/2022/06/Logo-MP_TP-Tucher-Ingenieure-GmbH-new-for-email-signature_TP-ARCHITEKTEN-UND-INGENIEURE-1.png Umwelt - Tucher Ingenieure GmbH https://tup.siera.com/en 32 32 Berechnung CO2-Footprint Scope 1 / 2 / 3 , Auswahl geeigneter Kompensations-Projekte https://tup.siera.com/en/projects/berechnung-co2-footprint-scope-1-2-3-auswahl-geeigneter-kompensations-projekte/?utm_source=rss&utm_medium=rss&utm_campaign=berechnung-co2-footprint-scope-1-2-3-auswahl-geeigneter-kompensations-projekte Wed, 09 Aug 2023 11:41:44 +0000 https://www.mup-group.com/?post_type=projects&p=21242
  • Calculation of CO2 footprint Scope 1 / 2 / 3 , selection of suitable offset projects
  • Feb - May 2021
  • IT Hardware
  • The first project phase, the CO2 footprint for Scope 1 & 2, was carried out in under 4 weeks
  • The post Calculation of CO2 footprint Scope 1 / 2 / 3 , selection of suitable offset projects first appeared on Tucher Engineers GmbH.

    ]]>
    CO2-Footprints für 3 Standorte in Deutschland https://tup.siera.com/en/projects/co2-footprints-fuer-3-standorte-in-deutschland/?utm_source=rss&utm_medium=rss&utm_campaign=co2-footprints-fuer-3-standorte-in-deutschland Wed, 09 Aug 2023 11:31:44 +0000 https://www.mup-group.com/?post_type=projects&p=21241
  • CO2 footprints for 3 locations in Germany
  • 2 months
  • IT Services
  • The post CO2 footprints for 3 locations in Germany first appeared on Tucher Engineers GmbH.

    ]]>
    CO2-Footprint und ESG-Report für die Gruppe inklusive ca. 10 eigenständiger GmbHs in Deutschland https://tup.siera.com/en/projects/co2-footprint-und-esg-report-fuer-die-gruppe-inklusive-ca-10-eigenstaendiger-gmbhs-in-deutschland/?utm_source=rss&utm_medium=rss&utm_campaign=co2-footprint-und-esg-report-fuer-die-gruppe-inklusive-ca-10-eigenstaendiger-gmbhs-in-deutschland Wed, 09 Aug 2023 11:28:04 +0000 https://www.mup-group.com/?post_type=projects&p=21239
  • CO2 footprint and ESG report for the group including approx. 10 independent GmbHs in Germany
  • 3 months
  • Environmental engineering services
  • The post CO2 footprint and ESG report for the group including approx. 10 independent GmbHs in Germany first appeared on Tucher Engineers GmbH.

    ]]>
    CO2-Footprints für 2 Standorte in Jena (D) und Jeřmanice (CZE) https://tup.siera.com/en/projects/co2-footprints-fuer-2-standorte-in-jena-d-und-jermanice-cze/?utm_source=rss&utm_medium=rss&utm_campaign=co2-footprints-fuer-2-standorte-in-jena-d-und-jermanice-cze Wed, 09 Aug 2023 11:21:18 +0000 https://www.mup-group.com/?post_type=projects&p=21237
  • CO2 footprints for 2 locations in Jena (D) and Jeřmanice (CZE)
  • 2 months
  • Production of optical components
  • The post CO2 footprints for 2 locations in Jena (D) and Jeřmanice (CZE) first appeared on Tucher Engineers GmbH.

    ]]>
    Projektsteuerung B-Planverfahren „Gewerbepark Semiramis“ https://tup.siera.com/en/projects/projektsteuerung-b-planverfahren-gewerbepark-semiramis/?utm_source=rss&utm_medium=rss&utm_campaign=projektsteuerung-b-planverfahren-gewerbepark-semiramis Thu, 15 Jun 2023 00:00:00 +0000 https://ibgw-leipzig.de/?post_type=projects&p=21089
  • Project description: The development plan for the "Semiramis Industrial Park" will open up an industrial estate of approx. 30 ha net commercial area in the south of Lübeck. Due to the location of the site in the area of a former orchard, extensive requirements with regard to nature and species protection, possible supply and disposal, and immission control had to be taken into account.
  • Our services: Support and accompaniment of the B-Plan procedure with regard to the organisation and coordination of the actual procedure as well as the awarding and accompaniment of engineering services (project control services according to AHO publication series no. 9 "Project management services in the construction and real estate industry", level 1 and 2).
  • Duration: 2017 - 2022
  • Industry of the client: Public client, municipal business development
  • The post Project management B-plan procedure "Semiramis industrial park first appeared on Tucher Engineers GmbH.

    ]]>
    Projektentwicklung Gewerbepark – Zum Schleusenpark, Datteln https://tup.siera.com/en/projects/projektentwicklung-gewerbepark-zum-schleusenpark-datteln/?utm_source=rss&utm_medium=rss&utm_campaign=projektentwicklung-gewerbepark-zum-schleusenpark-datteln Thu, 15 Jun 2023 00:00:00 +0000 https://ibgw-leipzig.de/?post_type=projects&p=21088
  • Project description: From industrial production at the site of a former zinc smelter in Datteln, contaminated soil and groundwater remained with a need for remediation. A new industrial park was to be developed on the site. For this purpose, the existing building fabric had to be dismantled and soil remediation had to be carried out. On the basis of a new urban land use plan, a new transport infrastructure was then built and the redeveloped land was marketed.
  • Our services in the area of environmental planning: advising the contracting parties on the purchase, project management services including cost and contract management as well as coordination of urban land use planning from the preparation of an urban development model with real estate location analysis to the legally binding land-use plan, participation in the marketing of the land areas incl. support of the project development up to the complete new development of the industrial park.
  • Duration: 2015 - 2016
  • Industry of the client: Development company as a municipal enterprise
  • The post Projektentwicklung Gewerbepark – Zum Schleusenpark, Datteln first appeared on Tucher Engineers GmbH.

    ]]>
    Errichtung einer Multifunktionalen Abdichtung auf der Deponie Ihlenberg https://tup.siera.com/en/projects/errichtung-einer-multifunktionalen-abdichtung-auf-der-deponie-ihlenberg/?utm_source=rss&utm_medium=rss&utm_campaign=errichtung-einer-multifunktionalen-abdichtung-auf-der-deponie-ihlenberg Thu, 15 Jun 2023 00:00:00 +0000 https://ibgw-leipzig.de/?post_type=projects&p=21087
  • Project description: A planning approval procedure had to be carried out for the construction of a multifunctional sealing (MFA) as an intermediate sealing between two landfill sections.
  • Our services: Deficit analysis of the available planning documents, implementation of the environmental impact assessment with preparation of a scoping document, attendance of the scoping meeting to coordinate the scope of the assessment with the approval authority, coordination of expert consultants as subcontractors, preparation of the report on the environmental impact assessment.
  • Duration: 2019 - 2022
  • Industry of the client: Waste disposal company / landfill operator
  • The post Construction of a multifunctional sealing system at the Ihlenberg landfill site first appeared on Tucher Engineers GmbH.

    ]]>
    Environmental Due Diligence („Quick-Check“) für eine Flächenentwicklung bei Hamburg https://tup.siera.com/en/projects/environmental-due-diligence-quick-check-fur-eine-flachenentwicklung-bei-hamburg/?utm_source=rss&utm_medium=rss&utm_campaign=environmental-due-diligence-quick-check-fur-eine-flachenentwicklung-bei-hamburg Thu, 15 Jun 2023 00:00:00 +0000 https://ibgw-leipzig.de/?post_type=projects&p=21084
  • Project description: In the context of a planned land acquisition of a former industrial site, the site-related framework conditions were to be examined.
  • Our services: Preparation of a desktop study ("quick check") to examine the site-related framework conditions with regard to planning law, geotechnics, contaminated sites, explosive ordnance, nature conservation and species protection, supply and disposal, traffic and noise; advising the client with regard to necessary further investigations (building pollutant investigation, subsoil and contaminated site investigation, species protection potential analysis and mapping, drainage concept); coordination of the necessary expert opinions via the corresponding specialist departments of the M&P Group and external subcontractors.
  • Duration: 2021 - 2022
  • Industry of the client: Real estate developer in the logistics industry
  • The post Environmental due diligence ("quick check") for a land development near Hamburg first appeared on Tucher Engineers GmbH.

    ]]>
    Genehmigungsverfahren zur Kapazitätserweiterung einer Zinkhütte https://tup.siera.com/en/projects/genehmigungsverfahren-zur-kapazitatserweiterung-einer-zinkhutte/?utm_source=rss&utm_medium=rss&utm_campaign=genehmigungsverfahren-zur-kapazitatserweiterung-einer-zinkhutte Thu, 08 Jun 2023 00:00:00 +0000 https://ibgw-leipzig.de/?post_type=projects&p=21022
  • Project description: The operators of the zinc smelter planned to increase the production capacity of the plant. As part of the increase in production capacity, modifications and additional equipment were to be added. The aim was not to increase the emissions emanating from the plant in the process. The planned expansion required a permit according to the Federal Immission Control Act (BImSchG) including an environmental impact assessment according to the Environmental Impact Assessment Act (UVPG).
  • Our services: Coordination of the required authority procedures, preparation of a scoping document for the environmental impact assessment (EIA), monitoring of the scoping procedure and preparation of the environmental impact assessment report, preparation of the application documents for selected chapters of the BImSchG application, integration of the construction application and compilation and finalisation of the application documents for the complete BImSchG application as well as preparation of an initial status report (preliminary assessment and phase 1).
  • Duration: 2017 - 2019
  • Branch of the customer: Industry / Pipe material processing
  • The post Approval procedure for the capacity expansion of a zinc smelter first appeared on Tucher Engineers GmbH.

    ]]>