Wasser - Tucher Ingenieure GmbH https://tup.siera.com/en Engineering for a better tomorrow Thu, 15 Jun 2023 00:00:00 +0000 en-GB hourly 1 https://tup.siera.com/wp-content/uploads/2022/06/Logo-MP_TP-Tucher-Ingenieure-GmbH-new-for-email-signature_TP-ARCHITEKTEN-UND-INGENIEURE-1.png Wasser - Tucher Ingenieure GmbH https://tup.siera.com/en 32 32 Grundwasserströmungsmodell Potsdam-Mitte https://tup.siera.com/en/projects/grundwasserstromungsmodell-potsdam-mitte-2/?utm_source=rss&utm_medium=rss&utm_campaign=grundwasserstromungsmodell-potsdam-mitte-2 Thu, 15 Jun 2023 00:00:00 +0000 https://ibgw-leipzig.de/?post_type=projects&p=21078
  • Focal points: Groundwater modelling
  • Duration since 2021
  • ProPotsdam GmbH
  • Contents:
    1. Expert assessment of the possible influence of the planned construction projects on the groundwater conditions in interaction with the existing buildings.
    2. Evaluation of the construction of several underground car parks as part of the urban development of the "Staudenhof and surrounding area of the Bildungsforum, taking into account existing buildings" site.
  • The post Groundwater flow model Potsdam-Mitte first appeared on Tucher Engineers GmbH.

    ]]>
    Windpark Krummensee 3 – Hydrologisches Gutachten für vorgezogene CEF-Maßnahme https://tup.siera.com/en/projects/windpark-krummensee-3-hydrologisches-gutachten-fur-vorgezogene-cef-masnahme/?utm_source=rss&utm_medium=rss&utm_campaign=windpark-krummensee-3-hydrologisches-gutachten-fur-vorgezogene-cef-masnahme Thu, 08 Jun 2023 00:00:00 +0000 https://ibgw-leipzig.de/?post_type=projects&p=21023
  • Focal points: Water balance, hydrology, hydrogeology
  • Duration 2021
  • Energy Source GmbH
  • Contents:
    • Hydrogeological exploration
    • Water balance assessment
    • Area optimisation of the planned standing water
  • The post Windpark Krummensee 3 – Hydrologisches Gutachten für vorgezogene CEF-Maßnahme first appeared on Tucher Engineers GmbH.

    ]]>