{"id":21193,"date":"2023-06-20T00:00:00","date_gmt":"2023-06-20T00:00:00","guid":{"rendered":"https:\/\/ibgw-leipzig.de\/?post_type=projects&p=21193"},"modified":"2023-06-20T00:00:00","modified_gmt":"2023-06-20T00:00:00","slug":"ausbau-des-nord-ostsee-kanals-testfelderkundung-kampfmittel","status":"publish","type":"projects","link":"https:\/\/tup.siera.com\/en\/projects\/ausbau-des-nord-ostsee-kanals-testfelderkundung-kampfmittel\/","title":{"rendered":"Expansion of the Kiel Canal, test field exploration for explosive ordnance"},"content":{"rendered":"
Period: since 2017<\/p>\n\n\n\n
Field of activity: Explosive ordnance disposal<\/p>\n\n\n\n
Scope of services:<\/p>\n\n\n\n
Results incl. update<\/p>\n\n\n\n
Cost estimation and transfer in GAEB format<\/p>\n\n\n\n
In the course of the replacement of the old Levensau High Bridge and the extension of the Kiel Canal (NOK) from km 93.2 to 94.2, the existing navigation channel is to be widened by receding the banks and dredging the beds. In preparation, geophysical investigations are to be carried out in the section of the canal in order to<\/p>\n\n\n\n
Load areas<\/p>\n\n\n\n
The investigation services and subsequent salvage services are to be put out to tender by the Federal Waterways and Shipping Administration (WSV). The investigation area is mostly under water and covered with armourstone containing iron silicate. The bank area from the water change zone to the shoulder of the embankment is designed as a paved area of armourstones (granite) with a backfill of slag rock on top. The planning of the test field soundings foresees the use of different echosounder and sonar methods to explore the water bottom. Subsequently, geomagnetic surface soundings using total field magnetometers and underwater TDEM soundings will be carried out. The comparison of all available results will provide reliable information on the applicability of the individual methods and their limitations. The measurement data from the 2019\/2020 soundings are currently being analysed in detail.<\/p>","protected":false},"author":51,"featured_media":0,"parent":0,"template":"","company-group":[],"project-category":[57],"class_list":["post-21193","projects","type-projects","status-publish","hentry","project-category-boden"],"aioseo_notices":[],"aioseo_head":"\n\t\t\n\t\n\t\n\t\n\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t\n\t\t